Charts
Summary
| Metric | Tram 19 |
|---|---|
| Average speed (km/h) | 12.1 |
| Average active vehicles | 5.6 |
| Peak active vehicles | 9 |
| Distance driven (km) | 1484 |
21 September – 27 September 2026
| Metric | Tram 19 |
|---|---|
| Average speed (km/h) | 12.1 |
| Average active vehicles | 5.6 |
| Peak active vehicles | 9 |
| Distance driven (km) | 1484 |