Charts
Summary
| Metric | Tram 9 |
|---|---|
| Average speed (km/h) | 12.6 |
| Average active vehicles | 4.0 |
| Peak active vehicles | 9 |
| Distance driven (km) | 1128 |
21 September – 27 September 2026
| Metric | Tram 9 |
|---|---|
| Average speed (km/h) | 12.6 |
| Average active vehicles | 4.0 |
| Peak active vehicles | 9 |
| Distance driven (km) | 1128 |